Home(916) 544-8114EPA Lead-Safe Renovation
Older-home renovation deserves careful control of lead-containing dust and debris. Serving homeowners, new buyers, and property investors throughout the Sacramento area.
3 Pyramid Construction & Renovation Corporation
California General Building Contractor — License #987850
- Licensed
- Bonded
- Insured
- EPA Lead-Safe Certified

Coordinated from first decision to final detail.
3 Pyramid is EPA Lead-Safe Certified and incorporates lead-safe work practices where qualifying pre-1978 painted surfaces are disturbed. The project plan can include testing, containment, controlled work practices, cleaning, and required documentation.
For Sacramento-area properties, we review the project address, age of the structure, existing conditions, access, local permit requirements, and connected trades before finalizing scope. This is especially important in established neighborhoods where older framing, plumbing, electrical systems, previous alterations, and lead-safe requirements can affect planning.
Select any line below to see what the work may include.
Work we can include
Project review for potential lead-safe requirementsClick for details
For qualifying older properties, this can include project review, required owner information, containment, protected access, controlled work methods, HEPA cleaning, waste handling, verification procedures, and project documentation.
Testing coordination where appropriateClick for details
This item is reviewed as part of the complete epa lead-safe renovation scope. We confirm existing conditions, preparation, materials, connected trades, installation sequence, finish details, permit or inspection needs, testing, protection, and cleanup before the proposal is finalized.
Work-area containment and occupant protectionClick for details
For qualifying older properties, this can include project review, required owner information, containment, protected access, controlled work methods, HEPA cleaning, waste handling, verification procedures, and project documentation.
Dust and debris control during renovationClick for details
For qualifying older properties, this can include project review, required owner information, containment, protected access, controlled work methods, HEPA cleaning, waste handling, verification procedures, and project documentation.
Thorough cleaning and verification proceduresClick for details
For qualifying older properties, this can include project review, required owner information, containment, protected access, controlled work methods, HEPA cleaning, waste handling, verification procedures, and project documentation.
Required owner information and project recordsClick for details
For qualifying older properties, this can include project review, required owner information, containment, protected access, controlled work methods, HEPA cleaning, waste handling, verification procedures, and project documentation.
Additional capabilities
Especially relevant to painting, carpentry, windows, doors, and demolitionClick for details
This can include jobsite protection, selective removal, dust and debris control, disposal, and careful exposure of concealed conditions. Anything unexpected is documented before the next phase proceeds.
Applies to qualifying pre-1978 homes and child-occupied facilitiesClick for details
This item is reviewed as part of the complete epa lead-safe renovation scope. We confirm existing conditions, preparation, materials, connected trades, installation sequence, finish details, permit or inspection needs, testing, protection, and cleanup before the proposal is finalized.
Project-specific requirements are confirmed before work beginsClick for details
This item is reviewed as part of the complete epa lead-safe renovation scope. We confirm existing conditions, preparation, materials, connected trades, installation sequence, finish details, permit or inspection needs, testing, protection, and cleanup before the proposal is finalized.
How the work moves forward.
Every property is different. This sequence is refined after we review existing conditions, selections, specialty trades, permits, and inspections.
- 01Identify the age and affected painted surfaces
- 02Determine applicable testing and work-practice requirements
- 03Set up containment and protect occupants and property
- 04Perform work using controlled methods
- 05Clean, verify, document, and remove containment