Home(916) 544-8114Flooring & Tile
Beautiful floors begin with correct preparation, transitions, and trim. Serving homeowners, new buyers, and property investors throughout the Sacramento area.
3 Pyramid Construction & Renovation Corporation
California General Building Contractor — License #987850
- Licensed
- Bonded
- Insured
- EPA Lead-Safe Certified

Coordinated from first decision to final detail.
We install and restore flooring as a stand-alone improvement or part of a larger remodel. Subfloor condition, flatness, moisture, layout, transitions, stairs, and baseboards are addressed before the last surface goes down.
For Sacramento-area properties, we review the project address, age of the structure, existing conditions, access, local permit requirements, and connected trades before finalizing scope. This is especially important in established neighborhoods where older framing, plumbing, electrical systems, previous alterations, and lead-safe requirements can affect planning.
Select any line below to see what the work may include.
Work we can include
Hardwood, engineered wood, laminate, and luxury vinylClick for details
This may include removal, moisture and subfloor review, repairs or leveling, layout direction, underlayment, installation, transitions, stair details, baseboards, sanding or coating where applicable, protection, and care guidance.
Marble, granite, natural stone, porcelain, and ceramic tileClick for details
This can cover material and edge selections, templates, substrate preparation, fabrication coordination, installation, seams, penetrations, sealing, backsplash transitions, and final protection of the finished surface.
Carpet and resilient vinyl installationClick for details
This may include removal, moisture and subfloor review, repairs or leveling, layout direction, underlayment, installation, transitions, stair details, baseboards, sanding or coating where applicable, protection, and care guidance.
Floor laying, leveling, layout, and subfloor repairClick for details
We review the existing flooring & tile conditions, measurements, traffic flow, priorities, finish choices, and practical alternatives. The final plan identifies what stays, what changes, and which decisions are needed before construction.
Sanding, refinishing, staining, and protective coatingsClick for details
We address surface repairs, cleaning, sanding, caulking, masking, primer selection, finish coats, detailed cut lines, touch-ups, and cleanup. The coating system is selected for the material, exposure, appearance, and expected use.
Stair restoration, installation, transitions, and baseboardsClick for details
This may include removal, moisture and subfloor review, repairs or leveling, layout direction, underlayment, installation, transitions, stair details, baseboards, sanding or coating where applicable, protection, and care guidance.
Additional capabilities
Epoxy floor coatingsClick for details
We address surface repairs, cleaning, sanding, caulking, masking, primer selection, finish coats, detailed cut lines, touch-ups, and cleanup. The coating system is selected for the material, exposure, appearance, and expected use.
Deck and floor coating systemsClick for details
We address surface repairs, cleaning, sanding, caulking, masking, primer selection, finish coats, detailed cut lines, touch-ups, and cleanup. The coating system is selected for the material, exposure, appearance, and expected use.
Material-selection guidance focused on durability and budgetClick for details
We review the existing flooring & tile conditions, measurements, traffic flow, priorities, finish choices, and practical alternatives. The final plan identifies what stays, what changes, and which decisions are needed before construction.
How the work moves forward.
Every property is different. This sequence is refined after we review existing conditions, selections, specialty trades, permits, and inspections.
- 01Inspect the substrate and adjoining elevations
- 02Confirm material, direction, pattern, transitions, and trim
- 03Prepare, level, repair, or undercut as required
- 04Install, finish, protect, and detail the perimeter
- 05Clean and review care recommendations